The pumping station can be installed on a trafficked or non-trafficked surface up to the axle load of 125 KN. At the bottom of the construction pit, foundation concrete needs to be constructed and has to be adjusted with the depth of the inflow or the height of the pumping station. The pumping station is installed on the foundation concrete. It is then anchored, the steel mesh is placed in position and finally the concrete wreath is poured over. When the pumping station is backfilled in and the backfill material is consolidated, an armoured concrete slab is constructed on the footway ortrafficked surface.